Six years on, LIFE Mission housing project at Madavoor still unfinished
A contract dispute over rising material costs has left the Madavoor housing project stalled, and the site is overgrown.
A flagship LIFE Mission housing project at Madavoor in the state capital, launched in 2020 to shelter homeless families, has remained stalled for six years. The delay stems from a contract dispute linked to rising costs of building materials.
With work halted, the site has become overgrown and abandoned.